PROJECT CONTROLS SYSTEMS

Project controls,
simplified.

The daily report shouldn’t take your morning. One upload and progress, cost, float, milestones, off-site equipment and safety rebuild themselves — no spreadsheets, no manual status updates, no interpreting the programme/schedule to manually build the report. Teams running Virtus get 4 hours a day back.

Built for shutdown/project managers, project controls leads and superintendents who are tired of interpreting the programme on the way to the report.
DASHBOARDHSEOFF SITEITP CENTRESCHEDULE READINESSDATA MANAGEMENT
COMPONENTWBSSENTDUE BACKRETURNVARSTATUS
AREACOMPONENTREMOVEDREPLACEDITPREFSTATUS
  • Baseline start and finish on every activity1,192 of 1,192100%
  • Actuals recorded up to the status dateno open activities behind 29 Oct100%
  • Crew assignments carried on activitiesneeded for the per-crew curves94%
  • Discrete inspection activities for ITP components40 components carry a demonstration ITP until the schedule holds one27 / 67
  • Open-ended logicactivities with no successor3 open
Progress Update 25 · P6 XER29 Oct 2025 · 06:411,192 activities
HSE register · CSV29 Oct 2025 · 06:441,496 records
Progress Update 24 · P6 XER28 Oct 2025 · 06:381,192 activities
Progress Update 23 · P6 XER27 Oct 2025 · 06:521,190 activities
Drop tomorrow's XER here and the whole dashboard rebuilds.Bring your own to the walkthrough →
Live demo — every tab, toggle and filter in this panel is clickable
0activities in the programme, read straight from the schedule
0daily updates — every one kept, any morning recoverable
0milestones in the programme, tracked against forecast
0components through removal, refit and inspection
0a day back, per team, from the morning report alone
0spreadsheets to maintain. None.
PROGRESS PROFILE
PlannedEarnedCum. plannedCum. earned
Live — switch to weekly, drill into a WBS, or filter to one crew

Planned against earned, every day

Grey is the plan for that day, green is what was actually claimed. Earned stops dead at the status date — the curve never guesses at work nobody has signed for. Daily for the crews on the floor, weekly for the commercial report, identical totals either way.

WBS REGISTER — SPI STATUS
WBSBAC (H)PVEVSVSPISTATUS
Scored on earned value, not on opinion.
Live — click a filter to hide whatever is already healthy

"We're behind" becomes "electrical is behind on the motors"

Drill from the whole shutdown/project down four WBS levels — boom, tub, hoist machinery, motors — or filter to one crew. The curve, the hours and the SPI all re-cut to whatever you picked. That's the version you can act on.

STATUS DATE
every update kept
23 Sep08 Oct23 Oct08 Nov24 Nov

Roll back to any past date

Every update ever uploaded is kept. Pick a date and the whole dashboard reports as it stood that morning. Settles the argument about what was known and when — useful in a claim, and useful in a post-mortem.

VIRTUS ASSIST
answers computed live from loaded data

Ask the project a question

Dates, hours and crew performance read straight off the programme, with the source activity UIDs against every figure. It states its own basis — which crews count as mechanical, how hours are apportioned — so the number can be argued with rather than taken on trust.

This is where to focus this morning

Baseline date passed with no actual recorded — the schedule raises it, nobody has to notice it. Worst first, with days late and the current forecast against every line.

  • 0tasks missed their baseline startWorst 5 days late · Hoist Gearbox 2 bearing & gearing · Boom foot · Vacuum circuit breakersMISSED START
  • 0of 70 critical tasks forecasting later than baselineRanked by total float — where the two days of slip actually liveCRITICAL PATH
  • 0of 36 off-site components due back lateSent date, contractual due back, forecast return, variance in daysOFF SITE
  • 0ITPs due — the inspector's list for the morning21 complete · 25 awaiting refit · a component can't show its ITP is ready until the refit isITP CENTRE
  • 0milestones slipped of the 5 you chose to trackMachine walks off shutdown pad · baseline 20 Nov · forecast 22 Nov · +2MILESTONES
  • 0overdue safety action, on the same screen as the schedule1,496 HSE records · 6 open actions · every one tied to the activity in that area that dayHSE

The dashboard is just the beginning

Virtus is a full project controls suite, tailored to your shutdown or project. The dashboard is the front door.

Weekly and monthly automated toll-gate reports
Monte Carlo cost and schedule range analysis
Cost and scope churn reporting and analysis
Risk and issue register
Contract vs schedule vs scope analysis
Automated lessons learnt
14-point DCMA quality assessment
Missed-finish notes and corrective actions auto-added to your risk register
Full-cycle automated action register
Variation tracking and reporting

Run it on your own shutdown/project

Send us a schedule export and we'll walk you through your own dashboard in about twenty minutes. Your data, your WBS, your crews.

  • Runs in a browser, on a phone, offline. Nothing to install.
  • No spreadsheets to maintain, no manual status.
  • Every update kept — roll back to any morning.
  • We'll show you the gaps in your schedule too. Readiness names every one.
Please enter your name
Enter a valid work email, e.g. name@company.com.au
Please enter your company
Enter a phone number with at least 8 digits
Check the highlighted fields — name, work email, company and phone are all needed.
No sales deck. We open your dashboard and start talking.

Got it.

We'll be in touch within one working day to lock in a time. If you have a P6 or MS Project export handy, have it ready — that's what we'll build from.